Projects & Engineering

From estimating and takeoff to final handover

A complete engineering system for contractors. It starts with the element library, estimating and quantity takeoff, moves through the contract, BOQ and planning, then site execution, quality and safety, and ends with variations, progress claims and handover. Every step is linked to inventory, purchasing, HR, fleet and accounting.

Screens and functions
33
Work areas
7
Stages in the cycle
7
The cycle

How work moves through the department

  1. 1Estimating
  2. 2Contract & BOQ
  3. 3Planning
  4. 4Site execution
  5. 5Quality & HSE
  6. 6Variations
  7. 7Claims & handover
Highlights

What sets this department apart

1

Estimates built from real components

Each BOQ line links to an engineering element with a material recipe and waste rate, and its rate is broken down into material, labour, equipment, subcontract and other costs.

2

The site under control, day by day

Work fronts tied to contract items, a 21-day look-ahead, open constraints and daily output compared with actual labour and plant hours.

3

Quality and safety gates that hold

Inspection and test plans with hold and witness points block the next stage until inspection is done, alongside HSE risks and commissioning tests.

4

The cost of change and delay, in numbers

Quantity changes backed by dimensional takeoff and approved drawings, direct pricing from the approved estimate, and delay exposure with extension-of-time records.

Inside the department

Every screen and function

These are the department’s screens as they appear in the system, arranged by work area.

Projects & contracts

4

Projects and their contracts, a project manager overview and the consultants assigned to each project.

  • Projects
  • Contracts
  • PM overview
  • Consultants

Engineering & estimating

6

An element library with material recipes and waste rates, and estimates based on quantity takeoff and rate analysis with approved revisions.

  • Engineering elements & BOM
  • Estimating & quantity takeoff
  • 2D and 3D dimensional takeoff
  • Rate build-up in five resource types
  • Markup and overheads
  • Estimate revisions and approval

Delivery & planning

4

Project operations, QS and commercial, planning and daily site reports in one place.

  • Project operations
  • QS / commercial
  • Planning
  • Daily site reports

Site execution command center

8

Run site work fronts with their output, constraints, materials, labour and plant, including work without a connection.

  • Work fronts linked to BOQ items
  • 21-day look-ahead
  • Constraints
  • Daily output and productivity
  • Actual labour and plant hours
  • Material reconciliation
  • Actual cost and estimate at completion
  • Offline site drafts

Quality, HSE & commissioning

5

Inspection and test plans with hold points, quality checks and re-inspections, safety risks, commissioning tests and handover.

  • Inspection & test plans (ITP)
  • Hold and witness points
  • Quality checks and re-inspection
  • HSE hazards and controls
  • Commissioning test packages

Variations & delay

4

Technical impact of variations, priced quantity changes, takeoff backed by drawings, and delay exposure.

  • Technical variation impact
  • Priced quantity changes
  • Takeoff with drawing proof
  • Delay exposure and EOT records

Document control

2

Document registers and revisions, inspection requests, drawings and consultant responses, with access rights for each file.

  • Document control
  • Attachments

Try Projects & Engineering with your own company

Create your company account and start a free trial to see it for yourself.